Repairs & safety

Code Corrections & Inspection Repairs in Albuquerque, NM

A correction notice is a list, not a verdict. We fix what is on it, call for the re-inspection, and deal with the inspector so you do not have to.

Fixed and signed off
We handle the re-inspection
PERMITS · PULLED
WARRANTY · 1 YEAR
LICENSE · 52188
CREWS · BACKGROUND-CHECKED
ESTIMATES · 24 HOURS
FAMILY-RUN SINCE 1992
Where the notice came from

Two situations, and they run differently.

A correction on work in progress is a different problem from a correction on work somebody did years ago. Knowing which you have changes who we talk to and how fast it closes.

A correction on current work

An inspection failed on an open permit. The scope is defined, the inspector has written down what he wants, and the job is to satisfy the list and get back on the schedule.

These usually close quickly. The permit is already open, so there is no new application to wait on.

A correction on somebody else's work

Unpermitted work turns up during a sale, or an inspector opens a panel and finds something a previous owner had done. Now there is a closing date and no permit on file.

These take longer, because the work has to be brought under permit before it can be signed off. We tell you that timeline honestly rather than after the fact.

Either way, you get the correction list priced item by item, so you can see what is a ten-minute fix and what is not.

What gets written up

Most correction notices list one of these four.

None of them are unusual, and none of them mean the house is unsafe to be in tonight.

Missing GFCI or AFCI protection

The most common item on a residential notice, and usually the quickest to clear once the right device is in the right place.

Grounding and bonding

A missing ground, a bonded neutral in a subpanel, or a water bond that was never made. Small parts, important function.

Box fill, support and access

Too many conductors in a box, cable that was never stapled, or a junction buried behind drywall where nobody can reach it.

Unpermitted work

A circuit added by somebody who never pulled a permit. It has to be brought under one before anyone will sign it off.

How the job runs

Four steps, and we make the inspector call.

01

Send us the notice

A photo of the correction notice is enough to start. It tells us the scope, the jurisdiction and usually the inspector, which is most of what we need.

02

We price it line by line

Each item on the notice gets its own number, so you can see what is trivial and what is not rather than receiving one figure for the whole list.

03

Corrections made to the written scope

We fix what the notice asks for. If we find something adjacent that is going to fail the next inspection, we tell you before touching it rather than adding it to the bill.

04

We call for the re-inspection

And we are there for it. You get the signed-off result, which is the thing a buyer, a lender or a title company is actually waiting on.

Cost

How corrections are priced.

By the item, because that is how the notice is written. A list of six corrections is usually not six times the cost of one.

Scope
What is involved
Starts at
Review and quote
Reading the notice, confirming scope with the jurisdiction, and pricing each item separately.
Quoted
Single-item corrections
A device, a bond, a staple, a cover. The items that make up most notices.
Quoted
Multi-item correction lists
Several corrections cleared in one visit, then one call for the re-inspection.
Quoted
Permitting unpermitted work
Bringing existing work under permit so it can be inspected and signed off. Timeline depends on the jurisdiction.
Quoted

Every figure is a starting point · Written itemized estimate within 24 hours

Questions

What people ask after a failed inspection.

My inspection failed. Is the house unsafe?

Usually not. A correction notice lists what does not meet code as written, which is a different question from whether something is dangerous tonight. Some items are urgent and some are paperwork. We will tell you which yours are when we read the notice.

Can you fix corrections another electrician was written up for?

Yes, and it is common. We work from the notice rather than from an opinion about the previous work, and we do not need the original contractor involved to clear it.

How long does a re-inspection take to schedule?

It depends on the jurisdiction and the time of year, and it is the part of the timeline nobody controls. We call it in as soon as the work is done and tell you what the current turnaround looks like rather than guessing.

We found unpermitted work during a sale. What now?

The work has to be brought under permit before anyone will sign it off, which means an application, the corrections, and an inspection. That takes longer than a straight correction list, so it is worth starting before the closing date gets close.

Do I have to be there?

Not for the corrections, and not for the re-inspection. We deal with the inspector directly and send you the result. Most people would rather not spend a morning waiting on an inspection window.

What if the inspector finds something new?

It happens, usually when opening something up reveals what is behind it. You get a price for the additional item before we touch it, and it never lands on the invoice as a surprise.

Who does the work
Three Corrales Electric electricians in branded high-visibility vests on a commercial job site in Albuquerque

Our electricians are background-checked.

We work inside banks, secured facilities and on-base jobs, and those accounts do not let an unvetted crew through the door. Every one of our electricians clears a background check before they work for us, and again every year after that.

For a panel replacement that means the person switching off your power has been checked by somebody other than us. Almost no residential electrician in this market can say that.

Where we do this work

Our shop is in Albuquerque. The name says Corrales.

We cover the metro, and the name should not make a homeowner in Los Lunas wonder whether we drive out.

Related

What usually comes up alongside this.

Tell us what it's doing. We'll tell you what's needed.

Written, itemized estimate within twenty-four hours from Brad or Brian. Calls answered after hours. Payment due on completion; no financing offered.

(505) 585-4894Book a Free Estimate