Commercial Panel & Service Upgrades in Albuquerque, NM

Three-phase service, switchgear and distribution panels for buildings asked to carry more than they were wired for. Permitted, inspected, and scheduled around your operation.

Bid from plans or a site walk
License #52188
PERMITS · PULLED
WARRANTY · 1 YEAR
LICENSE · 52188
CREWS · BACKGROUND-CHECKED
ESTIMATES · 24 HOURS
FAMILY-RUN SINCE 1992
Why it matters

The service is usually what holds the project up.

New equipment, another tenant, a kitchen, EV charging. The load calculation comes back over what the building has, and everything else waits on the service.

Capacity

When the existing service cannot carry the new load, it has to grow before the rest of the work proceeds. We run the calculation first so the number is real.

On most of these jobs the gear lead time is the long pole, not the labor.

Condition

Obsolete switchgear, failed breakers, corroded bus, and equipment nobody stocks parts for any more.

Often found partway through a tenant improvement. See commercial services →

Send the drawings if you have them. If you do not, we walk the site and build the scope from what is there.

What we do

Service, switchgear and distribution.

Commercial panel work from the service entrance through to the branch panels.

Service upgrades

Increasing the building's incoming service when the load outgrows it.

Switchgear & main panels

Main distribution panels, switchboards and main breaker replacement.

Three-phase power

Three-phase service and distribution for equipment that requires it.

Subpanels & distribution

Branch panels for new tenant space, added equipment and separate metering.

How the job runs

How a commercial service upgrade runs.

01

Load and site review

We look at the existing service, the gear in place and what the new load actually is.

02

Bid or written estimate

From your plans if you have them, from a site walk if you do not. Itemized either way.

03

Permit and utility coordination

We file the permit and coordinate the service change with PNM.

04

Shutdown on your schedule

The outage is planned around your operation. Tell us the window that works and we build the work around it.

05

Inspection and energization

Inspected, signed off and energized, with the paperwork handed over for your records.

Cost

How commercial panel work is priced.

Every one of these is quoted. What moves the number is the size of the service, the gear itself, and what the utility requires.

SCOPE
WHAT IS INVOLVED
QUOTED
Service upgrade
Increasing the building's incoming service, including utility coordination.
Per project
Switchgear or main panel
Main distribution equipment replaced or added.
Per project
Distribution or subpanel
Branch panels for new space, added equipment or separate metering.
Per panel
Load review
Working out what the building actually needs before anything is specified.
Per site

WRITTEN ITEMIZED ESTIMATE BEFORE WORK STARTS

Questions

What facilities managers ask.

Can the work happen outside business hours?

Usually. Planned shutdowns are scheduled around the building's operation. Tell us the window when you request the bid and we build the work around it.

Do you bid from plans?

Yes. Send the drawings and we bid from them. If there are no plans, we walk the site and build the scope from what is there.

Who handles the permit and the utility?

We do. We file the permit, coordinate the service change with PNM, and stay through inspection.

How long does a commercial service upgrade take?

The gear and the utility set the schedule more than the labor does. Switchgear lead times and the utility's calendar drive the date, and we give you both when we bid.

Are your crews background-checked?

Yes. That matters on occupied buildings, medical space and secure sites where access is controlled.

Who do I deal with?

Brad or Brian Palmerton. Brian co-owns the company and Brad runs operations. Call (505) 585-4894.

Who does the work
Three Corrales Electric electricians in branded high-visibility vests on a commercial job site in Albuquerque

Our electricians are background-checked.

We work inside banks, secured facilities and on-base jobs, and those accounts do not let an unvetted crew through the door. Every one of our electricians clears a background check before they work for us, and again every year after that.

For a panel replacement that means the person switching off your power has been checked by somebody other than us. Almost no residential electrician in this market can say that.

Related

More of our commercial work.

Tell us what it's doing. We'll tell you what's needed.

Written, itemized estimate within twenty-four hours from Brad or Brian. Calls answered after hours. Payment due on completion; no financing offered.