Level 2 charging on a dedicated 240V circuit, installed to code and inspected. We check whether your panel will carry it before quoting anything.
Four things determine what the job costs, and only one of them is the charger itself.
The base price assumes the charger is close. Every additional foot is wire, and past a certain run the wire has to get thicker.
A Level 2 charger draws 40 to 60 amps. On a house already running air conditioning and an electric range that is often more than the service has left.
A shared garage wall is straightforward. Running across the house, through a crawlspace or out to a detached garage is not.
A NEMA 14-50 receptacle and a hardwired charger are different installs with different requirements. The unit decides which.
A Level 2 charger is a serious addition to a house that was not built expecting one. The load calculation comes before the quote.
A charger is a continuous load, which means it is calculated at 125 percent of its rating. That is why a charger that looks like it fits on paper sometimes does not.
We run the numbers before quoting rather than after installing.
You need capacity before you need a charger. We will tell you that on the phone rather than on installation day, because finding out late is what turns a one-day job into two.
Houses adding both a charger and a spa almost always need capacity first. See service upgrades →
If that is you, start with the panel and the charger becomes the easy part.
Make and model, or the amperage if you have not bought yet. Hardwired and plug-in installs differ, and so do the requirements.
Whether the existing service carries the additional draw, calculated properly rather than estimated. This is the step that decides whether you are buying a circuit or a circuit plus capacity.
Itemized, from Brad or Brian, covering the circuit, the breaker, the mount, the permit and the inspection. No line item appears later that was not on it.
Dedicated 240V circuit from the panel to the charger location, breaker sized to the unit, charger mounted and terminated. Usually one day on site.
The inspector confirms it and you keep the permit number. Some utility and manufacturer rebate programs ask for it, so it is worth having on file.
Published as a starting point. The variable is distance from the panel, and whether the panel needs work first.
EVERY FIGURE IS A STARTING POINT · WRITTEN ITEMIZED ESTIMATE WITHIN 24 HOURS
A 240V receptacle for a plug-in charger starts at $600. A hardwired Level 2 charger starts at $1,050. Both include the permit and the inspection, and both assume the charger sits within about ten feet of the panel. Distance and whether your panel has the capacity to take the load move the number.
Yes. A Level 2 charger is a new dedicated 240V circuit and requires a permit and an inspection. Some rebate programs also ask for the permit number, so it is worth having on file regardless.
Often, but not always. A Level 2 charger is a continuous load calculated at 125 percent of its rating, which is why one that looks like it fits sometimes does not. We run a load calculation before quoting rather than after installing.
Most home Level 2 chargers run on a 40 or 50 amp breaker, with some units requiring 60. The charger's own specification decides it rather than a general rule, which is why we ask for the make and model before quoting.
Both are permitted. Hardwiring is generally preferred for higher-amperage units and outdoor installations. A NEMA 14-50 receptacle gives you the flexibility to take the charger with you. We will tell you which suits your unit and location.
Most EV charger installations are a single day on site once the permit is in place. The scheduling around it — the permit and the inspection — is what needs a few days' notice, so call when you order the car rather than when it arrives.

We work inside banks, secured facilities and on-base jobs, and those accounts do not let an unvetted crew through the door. Every one of our electricians clears a background check before they work for us, and again every year after that.
For a panel replacement that means the person switching off your power has been checked by somebody other than us. Almost no residential electrician in this market can say that.