A spa, a charger, a generator, a casita, a shop tool. All of it needs a dedicated circuit — and a panel with room to carry it.
Everything on this page adds load. A spa pulls 40 to 60 amps. A charger much the same. Both at once is most of a 100 amp service.
We work out what the house actually draws and what you are adding before quoting. Continuous loads are calculated at 125 percent of their rating, which is why something that looks like it fits sometimes does not.
If the service carries it, the job is a circuit and you are done.
You need capacity before you need a circuit. That is a panel or service job, and it is a different conversation with a different number attached.
Houses adding two of these at once almost always need capacity first. See service upgrades →
We would rather tell you on the phone than on delivery day, with the tub already sitting on the pad.
A dedicated 240-volt circuit, GFCI protection and a disconnect within sight of the tub. Permitted and inspected, so the warranty holds.
Level 2 charging at home. The load calculation comes first, because the panel decides whether the circuit is straightforward or not.
Standby or portable, sized to what you actually need running. The transfer switch is what keeps the generator off the utility line.
One appliance, one breaker, nothing else on it. For welders, shop tools, refrigerated air, kitchen and laundry equipment.
New square footage drawing on an existing service. The load calculation comes before the framing, not after.
Whatever you are adding, the first thing to establish is whether the house can carry it.
Dedicated 240V circuit, GFCI protection, a disconnect within sight of the tub and proper bonding. From $1,500.
Level 2 charging on its own circuit. A NEMA 14-50 receptacle from $600, hardwired from $1,050, within about ten feet of the panel.
Standby generator feeders and automatic transfer switches, so the changeover happens without anyone going outside.
Wiring a casita, addition or garage conversion, and single circuits for shop tools, welders, compressors and air conditioning.
Make and model if you have it, or the amperage. The spec sheet tells us what the circuit has to be, and dealers usually hand it over with the equipment.
Whether the existing service carries the additional draw. This decides whether you are buying a circuit or a circuit plus capacity.
Itemized, from Brad or Brian, covering the run, the breaker, any disconnect or bonding, the permit and the inspection.
Filed before work starts, then a dedicated circuit from the panel to wherever the equipment lives. Most of these are a single day.
The inspector confirms it and we are there when they do. You keep the permit number, which some rebate programs ask for and every future buyer's agent does.
Starting figures. Distance from the panel is the biggest variable on all of them.
EVERY FIGURE IS A STARTING POINT · WRITTEN ITEMIZED ESTIMATE WITHIN 24 HOURS
Anything on this page does. Spas, EV chargers, generators, shop tools and air conditioning are all continuous or high-draw loads that need a dedicated circuit rather than sharing one. Sharing causes nuisance tripping at best.
Often, but not always, and it is worth knowing before the equipment is delivered. We run a load calculation before quoting so you find out in advance rather than on installation day.
Yes. A new dedicated circuit requires a permit and an inspection everywhere in the metro. The permit number is also what some utility and manufacturer rebate programs ask to see.
Distance from the panel, mostly. A circuit run fifteen feet along a garage wall and one trenched across a yard are the same job with very different amounts of wire and labor in between.
Yes, and it is usually cheaper than doing them separately. But two added loads together is where capacity runs out fastest, so the load calculation matters more rather than less.
Before. If the panel needs work first, that changes both the cost and the timeline, and it is a much easier conversation while the equipment is still on order.

We work inside banks, secured facilities and on-base jobs, and those accounts do not let an unvetted crew through the door. Every one of our electricians clears a background check before they work for us, and again every year after that.
For a panel replacement that means the person switching off your power has been checked by somebody other than us. Almost no residential electrician in this market can say that.
We cover the metro, and the name should not make a homeowner in Los Lunas wonder whether we drive out.
Written, itemized estimate within twenty-four hours from Brad or Brian. Calls answered after hours. Payment due on completion; no financing offered.