Panel & electrical service

Electrical Service Upgrades in Albuquerque, NM

When the house needs more power than the service can carry. We size the new service, pull the permit, coordinate the meter pull with PNM and stay through the inspection.

From $3,850
100A to 200A, permit and inspection included
PERMITS · PULLED
WARRANTY · 1 YEAR
LICENSE · 52188
CREWS · BACKGROUND-CHECKED
ESTIMATES · 24 HOURS
FAMILY-RUN SINCE 1992
What actually changes

A service upgrade does not rewire your house.

People hear service upgrade and picture the walls coming open. It is a smaller and more specific job than that.

What changes

The service conductors, the meter, often the mast and weatherhead, and the panel itself. The utility disconnects and reconnects, and the amperage coming into the house increases.

Everything between the pole and the panel, in other words.

What does not

Your interior wiring. If the branch circuits are sound, they stay exactly as they are. A service upgrade is not a rewire and should not be quoted as one.

If the equipment is obsolete but the capacity is adequate, you need a panel replacement instead. See service upgrades →

That is a smaller job, and we will tell you if that is what you are looking at.

Why the service has to change

Replacing the panel alone does not add capacity.

These are the situations where the service itself has to grow, not just the equipment inside the box.

You are adding major load

A spa, an EV charger, air conditioning or a casita, and the load calculation says the existing service will not carry it.

The house is still on 100 amps

Common in anything built before the 1990s, and increasingly short for how a modern household actually draws power.

You are remodelling

A kitchen or an addition brings new circuits with it, and there is nowhere left to put them.

The service entrance has failed

A corroded mast, a damaged weatherhead or a meter can pulling away from the wall, which forces the work anyway.

How the job runs

Five steps, and the utility is one of them.

01

Load calculation

We work out what the house actually draws and what you are adding, so the new service is sized correctly rather than defaulting to 200 amps because that is the usual answer.

02

Written estimate within a day

Itemized, from Brad or Brian, covering the service, the panel, the permit, the utility coordination and the inspection.

03

Permit pulled, PNM scheduled

Filed with whoever has jurisdiction, then booked with the utility. A service upgrade means PNM pulls the meter, and we work to their window — which is the part a weekend operator cannot do at all.

04

Service and panel replaced

New conductors, new meter can and mast where needed, new panel, circuits landed and labelled. Power is off for most of a day.

05

Inspection and reconnect

The inspector signs off, PNM reconnects, and you keep the permit number and the passed inspection.

Cost

What a service upgrade costs in Albuquerque.

The number depends on what has to be replaced between the pole and the panel, not just the panel itself.

SCOPE
WHAT IS INVOLVED
STARTS AT
100A to 200A service upgrade
New service conductors, meter, panel, permit, utility coordination and inspection.
From $3,850
Larger service or service entrance work
400A service, mast and meter replacement, or converting overhead to underground.
Quoted

EVERY FIGURE IS A STARTING POINT · WRITTEN ITEMIZED ESTIMATE WITHIN 24 HOURS

Questions

What homeowners ask about service upgrades.

How much does it cost to upgrade from 100 amp to 200 amp service?

A 100 amp to 200 amp service upgrade in the Albuquerque metro includes the service conductors, the meter, the panel, the permit, the utility coordination and the inspection. What moves the number is the condition of the mast, the meter can and the entrance cable.

How long does a service upgrade take?

A service upgrade is usually a single day on site with the power off for most of it. The longer item is scheduling — the permit and the PNM meter pull have to line up before work starts, which is why the date is fixed in advance rather than during.

Do I actually need 200 amp service?

Not always. A load calculation answers it properly. A house with gas heat, gas water heating and no EV charger may be fine on 100 amps, while an all-electric home adding a spa will not be. We run the numbers before quoting.

Does PNM have to be involved in a service upgrade?

Yes. Increasing the service means the meter comes off and goes back on, and only the utility does that. We schedule it and work to their window, which is the part an unlicensed operator cannot arrange at all.

Will a service upgrade mean rewiring my house?

No. A service upgrade changes what comes into the house, not the circuits inside it. If branch wiring needs attention that is a separate job, and we would tell you so in the estimate rather than discovering it mid-week.

What is the difference between a service upgrade and a panel upgrade?

A panel upgrade replaces the equipment at the same amperage. A service upgrade increases the power coming into the house, which brings the utility and the meter into the work. Replacement is the smaller of the two, and plenty of people who ask for one need the other.

Who does the work
Three Corrales Electric electricians in branded high-visibility vests on a commercial job site in Albuquerque

Our electricians are background-checked.

We work inside banks, secured facilities and on-base jobs, and those accounts do not let an unvetted crew through the door. Every one of our electricians clears a background check before they work for us, and again every year after that.

For a panel replacement that means the person switching off your power has been checked by somebody other than us. Almost no residential electrician in this market can say that.

Where we do this work

Our shop is in Albuquerque. The name says Corrales.

We cover the metro, and the name should not make a homeowner in Los Lunas wonder whether we drive out.

Related

What usually comes up alongside this.

Tell us what it's doing. We'll tell you what's needed.

Written, itemized estimate within twenty-four hours from Brad or Brian. Calls answered after hours. Payment due on completion; no financing offered.

(505) 585-4894Book a Free Estimate