If your insurer will not renew, or a home inspection flagged the panel, the fix is a permitted electrical panel replacement with the paperwork to prove it. We handle both.
Plenty of old panels are fine. These two families are flagged for specific, documented reasons.
Breakers that in testing have failed to trip under overload conditions. A breaker that does not trip is not protecting the circuit behind it, which is the entire job it exists to do.
Produced into the 1980s and common in Albuquerque homes built through the 1960s and 70s.
Bus bar and breaker connection failures that can allow heat and arcing inside the panel, sometimes with the breaker still appearing to be on.
Zinsco panels often carry a Sylvania label, which is why people miss them. See service upgrades →
We will not tell you a panel is unsafe in order to sell you a job. If yours is sound and your insurer is satisfied, we will say so.
It comes up one of four ways, and three of them have a deadline attached.
The carrier will not renew until the panel is replaced, and they want documentation rather than a receipt.
You are selling, closing is weeks away, and the report named the brand.
The inspection came back and you are deciding whether to ask the seller or handle it after closing.
Federal Pacific, Stab-Lok, Zinsco, Sylvania-Zinsco or Challenger — and you went looking for what it means.
Brand, model and condition. A photograph of the label and the interior is usually enough to start, and you can send it before anyone visits.
Itemized, from Brad or Brian, covering the panel, the permit, the inspection and any service work the replacement brings with it.
Filed with whoever has jurisdiction. This is the step that produces the documentation your insurer or your buyer actually wants — not the new equipment, the paperwork proving it was done properly.
Old panel out, new one in, every circuit landed and labelled. Usually a single day with the power off for part of it.
The inspector confirms the work and you keep the permit number and the passed inspection. That is the document that closes the file with a carrier or a buyer's agent.
The equipment is a smaller part of the number than people expect. What moves it is what the old panel was concealing.
EVERY FIGURE IS A STARTING POINT · WRITTEN ITEMIZED ESTIMATE WITHIN 24 HOURS
Many carriers will not write or renew a policy on a home with a Zinsco panel, and some will not on Federal Pacific or Challenger either. It varies by carrier. What they want is a permitted replacement with a passed inspection on file, not just new equipment.
Open the panel door and look at the label inside. Federal Pacific panels are usually marked Federal Pacific Electric or Stab-Lok. Zinsco panels often carry a Sylvania label, which is why they get missed. Send us a photograph if you are unsure.
Challenger panels have a documented history of bus bar and breaker connection failures that can allow heat to build inside the panel. Whether yours has a problem is a question of inspection rather than brand alone, but the brand is why it gets flagged.
Not legally. But an obsolete panel surfaces at the two moments you least want it to — when a carrier reviews your policy and when a buyer's inspector writes their report. Replacing it on your schedule costs less than replacing it on theirs.
A permitted replacement with a passed electrical inspection resolves the panel as an inspection item. You keep the permit number, which is what a buyer's agent or an insurance adjuster asks to see.
Replacing a Federal Pacific or Zinsco panel in the Albuquerque metro includes the panel, the permit and the inspection. The variable is what the old panel was concealing — damaged conductors or improper connections found during the swap are quoted separately rather than discovered on the invoice.

We work inside banks, secured facilities and on-base jobs, and those accounts do not let an unvetted crew through the door. Every one of our electricians clears a background check before they work for us, and again every year after that.
For a panel replacement that means the person switching off your power has been checked by somebody other than us. Almost no residential electrician in this market can say that.
We cover the metro, and the name should not make a homeowner in Los Lunas wonder whether we drive out.
Written, itemized estimate within twenty-four hours from Brad or Brian. Calls answered after hours. Payment due on completion; no financing offered.