New square footage draws from the same service the house already has. What that service can still give up decides most of this job.
Adding a casita or an addition means adding load to a service that was sized for the house as it was. That is the first thing to establish, and it is cheaper to establish it before the framing goes up than after.
New rooms are usually fed from the existing panel, as long as it has both the spaces and the capacity. Where it does not, the panel or the service comes first, and that changes the budget rather than the plan.
The wiring itself goes in while the walls are open. Miss that window and the same work costs considerably more.
A separate building generally wants its own subpanel, fed by one buried or overhead run, with a grounding electrode at that structure. That way its occupant can reset a breaker without coming into your house.
If it is a rental or a permitted dwelling, the inspection standard is the same as for the main house. We build to that from the start.
We would rather look at the plans before the slab goes down. The load calculation at that point is free, and it is the number that decides everything after it.
Four moments in a project where the electrical decision has outsized consequences.
A load calculation at this stage tells you whether the existing service covers it. Finding out later usually means a panel or service upgrade on top of a budget already committed.
Boxes, circuits and runs go in now. Anything added after drywall means cutting it open again, and that is finish work on top of electrical work.
A permitted dwelling gets inspected like a dwelling. Smoke and carbon monoxide detection, GFCI and AFCI coverage, and a disconnect at the structure all apply.
Conversions change what the space is for, and the requirements follow. Garage circuits and habitable-room circuits are not the same thing.
What the new space will draw, against what the service can still give. This is where you find out whether a panel or service upgrade belongs in the budget.
We file the electrical permit and work to the framing schedule. Our part has to land between framing and insulation, and missing that window costs everyone time.
Boxes set, circuits run, panel or subpanel fed. Everything that has to be behind a wall goes in while there is no wall.
The inspector sees it open. Nothing gets covered until it has been signed off, which protects you more than it protects us.
Devices, fixtures, covers and the panel directory, then the final inspection. You get a space that was built to be inspected rather than one that happened to pass.
Square footage matters less than the number of circuits and whether the existing service can carry them. We quote from the plans.
Every figure is a starting point · Written itemized estimate within 24 hours
Sometimes, and the load calculation is what tells us. It depends on the service rating and what is already connected, not on whether there are empty spaces in the box. A panel can look half empty and still be at its limit.
A detached one usually does, in the form of a subpanel fed from the house. That means one run rather than several, and it lets whoever lives there reset their own breaker.
Between framing and insulation for the rough-in, then again after drywall and paint for the trim. Those two windows are set by your builder's schedule, so the earlier we are talking the better it goes.
Yes, and often that is how these come to us. We can also work directly with a homeowner acting as their own general, as long as somebody is holding the schedule together.
Yes. New circuits in new space are permitted and inspected, with a rough inspection before anything is covered and a final at the end. We file it and attend both.
Brad or Brian Palmerton. Brian co-owns the company and Brad runs operations. Call (505) 585-4894.

We work inside banks, secured facilities and on-base jobs, and those accounts do not let an unvetted crew through the door. Every one of our electricians clears a background check before they work for us, and again every year after that.
For a panel replacement that means the person switching off your power has been checked by somebody other than us. Almost no residential electrician in this market can say that.
We cover the metro, and the name should not make a homeowner in Los Lunas wonder whether we drive out.
The usual answer for a detached casita: one feeder to the building, breakers where the occupant can reach them.
When the load calculation says the existing panel cannot carry the new space, this comes first.
Going to 200 amps when the whole property, not just the panel, has run out of room.
Written, itemized estimate within twenty-four hours from Brad or Brian. Calls answered after hours. Payment due on completion; no financing offered.