The chargers are the last thing we install. What takes the time is the service capacity, the trenching and the conduit, and that is where the budget actually goes.

Capacity assessed first
Before any equipment is specified
PERMITS · PULLED
WARRANTY · 1 YEAR
LICENSE · 52188
CREWS · BACKGROUND-CHECKED
ESTIMATES · 24 HOURS
FAMILY-RUN SINCE 1992
Where the money goes

The chargers are the cheap part.

Most people start by choosing equipment. The equipment is rarely what decides the project, and it is rarely the largest line on the estimate.

What drives the cost

Distance from the electrical room to the parking, what is between the two, and whether the service has capacity left. Trenching across a lot, cutting and patching asphalt, and running conduit are the heavy items.

Where the existing service cannot carry the new load, a service upgrade comes before any of it, and that changes the shape of the whole project.

Why it pays to oversize the path

Trenching is the expensive part, and it is expensive once. Pulling larger conduit and setting spare capacity while the trench is open costs a fraction of reopening it in three years.

We will usually show you two numbers: what you asked for, and what it costs to make the next expansion straightforward.

The assessment comes first. If the answer is that the site cannot support what you have been quoted elsewhere, you should hear that before you sign anything.

Who this is for

Four kinds of property, four different problems.

What the site is for changes what matters: billing, access, uptime or simply getting the conduit there.

Apartments and multifamily

Shared parking means shared equipment and a question about who pays for the power. Pedestal units with two ports serve two spaces from one feed, which is usually the efficient answer.

Employers and offices

Cars sit all day, so Level 2 is plenty and load management matters more than speed. A handful of ports shared across a shift often beats fewer, faster ones.

Retail and hospitality

Dwell time is shorter and the charger is partly a draw for customers. Placement, lighting and how obvious it is from the street start to matter as much as the electrical.

Fleets

Vehicles return on a schedule and have to leave charged. That is a load management problem first and an equipment problem second, and it usually involves the service.

How the job runs

Assessment, then infrastructure, then equipment.

01

Site and capacity assessment

What the service is rated for, what the building already draws, and what is left. That number decides how many ports the site can support before anybody picks a brand.

02

Route and placement

Where the equipment room is, where the spaces are, and what lies between. Asphalt, landscaping and existing utilities all change the number, so we walk it rather than measure it off a map.

03

Written scope and a second option

What you asked for, and what it would cost to leave room for expansion while the trench is open. You decide which one gets built.

04

Permit and install

Trenching, conduit, feeders, pads and bollards, then the units themselves. Bollards are not optional in a parking lot, whatever the equipment quote says.

05

Inspection, commissioning and handover

Inspected, energised, tested under load and handed over with documentation of what was installed and where it runs, which matters the first time something needs service.

Cost

How commercial charging is priced.

Every one of these is site specific, because the distance from the panel to the parking space is the largest variable and no two lots are the same.

Scope
What is involved
Starts at
Site and capacity assessment
Service rating, existing demand and available capacity, with a written statement of how many ports the site supports.
Quoted
Level 2 ports, existing capacity
Pedestal or wall units, pads and bollards, fed from a service that already has room, with permit and inspection.
Quoted
Trenching and conduit across a lot
Cutting, trenching, conduit, backfill and patching to reach parking away from the building.
Quoted
Service or distribution upgrade
Where the existing service cannot carry the added load, quoted as its own phase of the project.
Quoted

Every figure is a starting point · Written itemized estimate within 24 hours

Questions

What property managers ask.

How many chargers can my site support?

That comes out of the capacity assessment rather than out of the parking count. The service rating and the building's existing demand set the ceiling, and load management can raise how many ports fit under it.

Do we need Level 3 fast charging?

Usually not. Level 3 suits sites where vehicles stop briefly. Where cars sit for hours, which covers most apartments and workplaces, Level 2 does the job at a fraction of the electrical infrastructure.

Can residents or staff be billed for the power?

Yes, through networked equipment that meters each session. That is a decision about the equipment and the service plan behind it rather than about the wiring, and it is worth settling early because it affects what gets installed.

What about the bollards and the pad?

Both are part of the job. A charger in a parking lot without protection gets hit eventually, and replacing a struck unit costs more than the bollard did.

Can we start small and add more later?

Yes, and it is worth planning for at the trenching stage. Oversizing conduit and leaving capacity while the ground is open costs far less than reopening the lot when demand grows.

Who do I deal with?

Brad or Brian Palmerton. Brian co-owns the company and Brad runs operations. Call (505) 585-4894.

Who does the work
Three Corrales Electric electricians in branded high-visibility vests on a commercial job site in Albuquerque

Our electricians are background-checked.

We work inside banks, secured facilities and on-base jobs, and those accounts do not let an unvetted crew through the door. Every one of our electricians clears a background check before they work for us, and again every year after that.

For a panel replacement that means the person switching off your power has been checked by somebody other than us. Almost no residential electrician in this market can say that.

Where we do this work

Our shop is in Albuquerque. The name says Corrales.

We cover the metro, and the name should not make a homeowner in Los Lunas wonder whether we drive out.

Related

Work that usually comes with it.

Tell us what it's doing. We'll tell you what's needed.

Written, itemized estimate within twenty-four hours from Brad or Brian. Calls answered after hours. Payment due on completion; no financing offered.